Home
Capabilities
Past Performance
Products & Pricing
Testimonials
Contact Us
About Us

Past Performance  
transporting voluminous amount of waste through a secure area took up labor time that was needed elsewhere
the Clydesdale's 6-to-1 compaction ratio cut down the number of trips through secret and highly secure checkpoints
time, labor and transportation costs were reduced dramatically
Atlanta Police Department
items such as pirated dvds, cds and illegal alcohol bottles had to be destroyed quickly and permanently
landfill-ready Clydesdale polyethylene bags hold an enormous amount of contraband items
illegal material were removed from circulation permanently
Boeing
Foreign Object Debris (F.O.D.), a hazard to military aircraft, was overflowing bins in the Wichita, KS facility
after the Clydesdale proved itself substantially in compacting F.O.D., Boeing put 33 machines in the plant
trash removal has been reduced by a 6-to-1 factor throughout the facility, freeing up needed manufacturing space
Baldinger
trash generated from unneeded packaging materials
placed the compactor inside the bldg., 12 feet away from where waste was being generated
company saves $200 to $260 a month on dumpster, labor and energy fees
Cott
Wyomissing, PA plant was overrun with plastic wrap, collection bins and assorted waste
since the Clydesdale needed no skilled operators they placed it on the production floor
the compactor got rid of the mounds of plastic and extra bins giving Cott a safer, cleaner more efficient work facility
   


 


 

 

GSA Schedule: 51V SIN:105-002 under Noble Sales Inc.

Please call 1-888-3KenBay (1-888-353-6229) | NJ Office 1-973-543-3200

   

Home   |   Capabilities   |   Past Performance   |   Products & Pricing   |   Testimonials   |   Contact Us   |   About Us